Capacity Planning - 4
So far we are looking into the ages of Industrial age which has to meet, supply demand of products. Later stage we have Modern Information Technology age.
Information Technology has variety of requirements throughout
their hardware, software requirements. Whenever application or software got hit
into the market, their capacity to be planned robustly. IT companies has
capacity planning to have the measurability, scalability to cater their future
requirements of forecasting. Also, savings on budget, to avoid the spendings on
licenses, hardwares, products, software applications etc.,
Along with the PERT CPM, Gantt chart become more popular in
this age it provided visually appealable planning of capacity. Many software
provides the feasibility of finding the Critical path by locating the depending
tasks, sub-tasks which will be helpful not only visualize the longest path also
the critical path which total float 0 for the project.
Work Breakdown Structure
WBS is another tool while planning, explaining every tasks
and making it in a box or an event/task you can mention it as Work Breakdown
structure. You can go at any number of tasks and sub-tasks level with WBS. But
recommended one for Work Breakdown structure is upto 3 levels.
Work Break down structure for
Project: Build a House
- 1 Foundation
- 1.1 Excavate site
- 1.2 Pour foundation
- 2 Framing
- 2.1 Build walls
- 2.2 Install roof trusses
- 3 Plumbing
- 3.1 Install pipes
- 3.2 Connect to main water supply
- 4 Electrical
- 4.1 Wire the house
- 4.2 Install electrical fixtures
- 5 Interior Finishing
- 5.1 Paint walls
- 5.2 Install flooring
-
5.1.1
Install cabinetry
- 6 Exterior Finishing
- 6.1 Siding
- 6.2 Landscaping